Categories
3D Printing

Material Station and Air Manager Installation

Material Station Installation

Mount the Ultimaker S5 to the Material Station

01

Carefully place the Ultimaker S5 on top of the Material Station

02

Insert a tube coupling collet in the bottom of each feeder of the Ultimaker S5

03

Insert the left Bowden tube of the Material Station into the left feeder, and the right Bowden tube into the right feeder

04

Secure the Bowden tubes with clamp clips

05

Place the spool holder cap into the hole of the Ultimaker S5’s spool holder


Air Manager Installation

Mount the Air Manager on the Ultimaker S5

01

Align the mounting bracket with the back of the Ultimaker S5

02

Guide the Bowden tubes and print head cable into both mounting bracket slots. Above feeder 2, make sure that the Bowden tube is placed in front of the print head cable

03

Gently push down on the mounting bracket until it clicks firmly into place

04

Align the bottom of the filter housing with the slots in the mounting bracket and push it into place

05

Gently push the filter completely into the filter housing

06

From the front of the printer, place the cover over the filter housing

07

Align the hinges with the mounting bracket and drop the cover into place


Plugin the connectors

01

Connect the Air Manager cable to the port at the back of the Air Manager

02

mounting bracket around the Air Manager cable and close it

03

Slide the stress relief clip upwards until it cannot go further to secure the cable in place

04

Connect the other side of the Air Manager cable to the UMB OUT port on the Material Station

05

Connect the Material Station cable to the UMB IN port on the Material Station and the other end to the UMB OUT port on the Ultimaker S5

06

Connect the power extension cable to the Ultimaker S5 and the Material Station

07

Connect the power cable to the Material Station and the other end to a power outlet

Proper cable and PTFE routing